无码观看欧美夜夜夜夜爽_天天做天天摸天天爽天天爱_欧美国产日产一区二区_99久久国产露脸精品竹菊传媒_国产卡一卡二卡三精品_苍井空毛片精品久久久_欧美人又长又大又粗无码视频一区_伊人久久久大香线蕉综合直播_国产亚洲综合欧美视频_久久伊人色av天堂九九

NHI Headlines

NHI’s TBM creates a successful open for the extension line between Beijing and Tianjin

Published:2015-04-07

Recently, that the Φ11.97m slurry balance TBM calledNO. 45 of SHMG emerged through 18 months work. It marks the successful open for the extension line between Beijing and Tianjin, which is the national key construction project in China.

The full length of the extension line between Beijing and Tianjin is 44.815 kilometers, for the only one TBM tunnel with 2.8 kilometers; the Φ11.97m bentonite slurry balance TBM with air cushion type from our company is used in the part of 2.25 kilometers. The installed total power of the equipment is 3960kw. The length of main body is 50 meters and the weight is 1300 tons.

It creates another successful achievement after that NHIs TBM is used in the national projects of high-speed rail SHIZIYANG tunnel between Guangzhou and Shenzhen, Wuhan river tunnel as the first tunnel of Yangtze River, the railway underground line for Beijing and Tianjin in China.